The city has multiple liquid waste lift stations around the town that they maintain and operate for the citizens of Mangonia park. After a hurricane or other catastrophic event if these lift stations do not have power for their pumps a potentially life threatening situation could arise. We were hired to install back- up standby generation to seven of the lift stations around the city.

This involved building the concrete pads for mounting the generators, fabricating the stands for mounting the automatic transfer switches and in some installations modifying the existing electrical panels. We also, either repaired existing or installed new fencing.